💬 Request a Quote, It's FREE!!!

The Client has now requested that you progress the design for full planning and tender preparation, to achieve this you will need to produce a Bill of Quantities using MMHW (Method of Measurement for Highway Works) for the Drainage elements

Accessed 9/9/24 

Assessment 2 Brief Key dates and details Assessment Detail

Assessment Information

Assessment Type: Individual Report

Assessment Weighting:

40%

Word count/Length:

2000 words +/- 10%

Learning Outcomes:

3, 4

Submission Method:

Turnitin

Submission Date:

12:00 Noon UK time, 8/01/2026

Provisional Feedback Release Date:

16.00 UK time, 23/01/2026

Description of the assessment After your work on the drainage design, provisional planning approval has been granted.

The Client has now requested that you progress the design for full planning and tender preparation, to achieve this you will need to produce a Bill of Quantities using MMHW (Method of Measurement for Highway Works) for the Drainage elements of the contract.

Further to this you will need to ensure that the proposed materials are compliant to the Contract Specification, this will be for a series of element from the works. This will be done by testing in the laboratory. The tests include:

PSV Skid Test Surface texture (sand patch) CBR formation AAV Aggregate Grading Subbase Surface profile Pen Test on Bitumen The final aspect of your work is to address the CDM requirements to show how your scheme will address construction and future maintenance, this will be in the form of a short report, justifying your design choices.

Marks Weighting: Specification Testing  50%

Take off and Bill for the Drainage 30%

CDM compliance 20%

100%

Relationship to Programme Assessment Strategy This assessment introduces aspect of contract documentation and applied health and safety practice which links underlying requirements of many of the modules to be studied in the final year of your degree programme.

Attributes and Skills You will develop skills around contract preparation and the development of specification writing and CAD work. You will be applying standardised management systems, preparing and developing your skill for professional practice

 

Skills

Links to useful resources

Critical thinking

Critical Thinking - Critical Thinking - LibGuides at University of Derby

Communication

Writing at University - Writing at University - LibGuides at University of Derby

Collaboration

Preparing for Study - Preparing for Study - LibGuides at University of Derby

Creative problem solving

Critical Thinking - Critical Thinking - LibGuides at University of Derby

Self-direction & planning

Types of Assessment - Types of Assessment - LibGuides at University of Derby

Numeracy, statistics & financial literacy

Maths and Numeracy - Maths and Numeracy - LibGuides at University of Derby

Digital

Introduction to Digital Skills - Digital Skills - LibGuides at University of Derby

Resilience

Academic Wellbeing - Academic Wellbeing - LibGuides at University of Derby

Adaptability

Student support - Study - University of Derby

Leadership & future thinking

Your Future, Start Now - Your Future, Start Now - LibGuides at University of Derby

Assessment Rubric The rubric has been attached to the Turnitin Submission point and a copy can be found at the end of this brief

Anonymous Marking Submissions in Turnitin and Blackboard

You must submit your work using your student number to identify yourself, not your name. You must not use your name in the text of the work at any point. When you submit your work in Turnitin you must submit your student number within the assignment document and in the Submission title field in Turnitin. Guidance is available showing how to do this.

Assessment Regulations The University’s regulations, policies and procedures for students define the framework within which teaching, and assessment are conducted. Please make sure you are familiar with these regulations, policies and procedures.

Mapping of KSBs Indicative Work-Related Tasks

Applying the DMRB and SHW (K5) Applying MMHW to real life projects (B4) Exploring all the supporting elements of design including related audits (K8, S8, S11) Rubric Rubric 5HX507

Ass 2

Professional 100%

Outstanding 85%

Excellent

75%

Very Good 65%

Good

55%

Satisfactory 45%

Marginal

35%

Poor

25%

Limited incomplete 10%

NS/Omitted

0%

Specification

50%

this will be professional report show compliance or failure to meet the specification covering detailed aspects for each element, whilst being concise and direct it will be Construction ready

this will be outstanding and cover detailed aspects for each compliance test , whilst being concise and direct it will align to the requirements of construction document and be robust

this will be excellent and cover the majority of the  detailed aspects for each element, whilst being concise and direct

The four tests will be logically laid out with consideration to all the fundamental aspects and links to related standards, the specification will be very good and usable

4 tests  aspects will be addressed to a sufficient standard to allow the further development towards a full specification, shortcomings will be very minor

The Three elements will have been completed but only adequate coverage of aspects including standards and installation etc... addressed

Although addressed with three included there will be some shortcomings and gaps in the specifications as presented

The testing will be inadequate or not the minimum of  three attempted and little evidence of application of the principles

Limited work or incomplete and of limited academic value

Nothing of merit or omitted

Bill of quantities

30%

All complete and correct with robust evidence trail, cost will have been developed for an item based on a suitable pricing reference such as Spons or Wessex

All complete and correct with robust evidence trail, cost will have been developed for an item

All complete and correct with robust evidence trail, thought will have been given to likely costs

completed to a very good standards with a strong evidence trail and all extensions and descriptions applied and correct

both aspects addressed with a workable bill and clear evidence trail, some assumptions and the finer detail may require reinspection or editing

there will be a significant attempt but there will be some minor omissions or errors in the approach, quantities, MMHW descriptions

the sections will be attempted and evidenced but there will be minor shortcomings and omissions detracting from the final work

either element the bill or the take off will be omitted or there will be major omissions from the two series 500 (Drainage) or series 700 (Pavements)

Limited work or incomplete and of limited academic value

Nothing of merit or omitted

Compliance

20%

Professional defence of key aspects and focus on the current drivers in the industry for auditing compliance to standards whilst being balanced

an outstanding defence of key aspects and focus on the current drivers in the industry for auditing aligned to standards

the defence of key aspects will be excellent and focus on the current drivers in the industry for auditing

All aspects will have been addressed to a very good standard and the defence of aspects of the design will be logical and clear, mentioning support legal compliance etc...

All the aspect will be addressed but consideration to supporting detail like standards and the legal aspects will have not been investigated

There will be coverage of the sections but the depth in areas or the defence raised will be questionable

although all addressed the work will be limited by its breadth or shortcomings on the discussion will be clear

there will be significant omissions and gaps in the report to support or defend the final design

Limited work or incomplete and of limited academic value

Nothing of merit or omitted

WhatsApp