💬 Request a Quote, It's FREE!!!

You are the Chief Regulatory and Manufacturing Engineering team of Charlton Co & Ltd, and you are tasked to work on a project titled “Wireless Bluetooth Intelligent Security Box/Safe” to bring the product through

CW 1:- Manufacturing Package For Wireless Bluetooth Intelligent Security Box/Safe

TASK 

You are the Chief Regulatory and Manufacturing Engineering team of Charlton Co & Ltd, and you are tasked to work on a project titled “Wireless Bluetooth Intelligent Security Box/Safe” to bring the product through regulatory certification and manufacturing readiness for the USA market.

You are to plan, prepare, document for:

CW 1: Manufacturing to bring the PCBA from DFx design consideration, through pilot run, mass production ready for product launch of a regulatory certified box/safe.

Prepare a proposal with a detailed report and explain the strategy taken, and the various documentation package for DFx, quality and reliability testing, functional test and its jig, preregulatory certification testing, and manufacturing package.

The following must be included.

CW1 PSB5037EE Marking Scheme

CW1 PSB5037EE (Mfg) MSMarks
(Max 100 marks)
Comment
Grand Total100 
1. Technical File20 
Ans:  
– List the component failure mechanism, reason, mode and type of failures per prototype build required (LO1)3 
– Product Design Technical specification2 
– Hardware Architecture Block Diagram and Circuit Principle of Operation2 
– Schematic diagram3 
– PCB layout3 
– Bill-of-Material with UL Rating, Tape & Reel information2 
– Technical Design Risk Assessment3 
– Thermal Profile Risk Assessment2 
2. The following DFx must be included:44 
a. DFQ Design for Quality and Reliability.10 
Ans:  
Design for Quality: (LO2A)  
– Design of a safe/box, and it’s components with sufficient voltage, current, power rating considerations.1 
– Design of a safe/box, and it’s components with sufficient temperature considerations1 
– Parts selection with UL rating, ROHS compliant requirements.2 
– Thermal profiling of board, component for overheat.2 
– Emission test (Conducted and Radiated)2 
– Immunity test (Conducted and Radiated), including ESD2 
Ans:  
Design for Reliability: (LO2A)10 
– Thermal cycling test2 
– Drop test2 
– Vibration test2 
– IPx dust test2 
– 100K Button push test1 
– Mechanical force open test1 
b. DFT Design for Testability. (LO2D)4 
– Test points for probe access2 
– Clearance between components.2 
c. DFM Design for Manufacturability. (LO2B)8 
– PCB Manufacturer’s requirements2 
o Current handling capability 
^ PCB trace thickness1 
^ PCB trace-to-trace clearance1 
^ PCB trace-to-pad clearance1 
o Components to edge of board clearance1 
o Component to component clearance for pick and place machine and desoldering1 
o Panel size and orientation1 
d. DFR : Design for Regulatory Certification (LO2C)12 
– UL 60950-1 or UL 62368-1 (newer) Regulatory standard considerations4 
– FCC Part 15A Regulatory Standard for intentional radiators considerations2 
– FCC Part 15B for electromagnetic compatibility (EMC) of electronic devices2 
– Design for reduced emission on trace loop area considerations2 
– PCB ground plane and Vcc plane considerations2 
3. PCB Fabrication Package: (LO3)2 
– PCB Gerber files for PCB fabrication1 
– PCB Penalization document1 
4. Factory Documentation package for manufacturing (LO3)12 
– Stencil fabrication for solder paste1 
– Component assembly procedure2 
– Functional Test procedure2 
– Electronic board diagnostic procedure2 
– PCBA Assembly Instructions2 
– Process flow chart2 
5. Failure Analysis and Failure Modes Identification (LO1)22 
o List potential failure modes for each component and functional block.4 
o List common failure modes such as open circuits, short circuits, and component degradation.4 
o Evaluate the criticality and impact of identified failure modes.2 
o Prioritize potential failures based on safety, functionality, and user impact.2 
o Propose corrective actions to address identified failure modes.2 
o Consider design improvements, component replacements, or changes to manufacturing processes.2 
o Verify that the corrective actions effectively mitigate the identified failure modes.2 
o Validate the changes through testing and simulation.2 

Only one team report should be submitted by one team member and should include team members names. This should be a PDF file. (Please make sure that the conversion from Word to PDF follows the correct formatting).

The assignment report’s file name should begin with the team’s name and the up-loader’s surname. The other team members should upload a cover sheet with the filename: coversheet followed by the team’s name. The cover sheet template is provided on Blackboard.

Note: it is very important that the work submitted is an individual effort.

Keep a safe copy of all coursework submitted for reference.

No copying is allowed.

The use of AI Tools such as ChatGPT is not allowed.

Student found to plagiarize may be referred to the school for action and zero marks will be awarded for any number of students involved.

WhatsApp