You have been appointed as the Site Safety and Health Officer (SHO) for a commercial building development project currently in the pre-construction stage. The project involves the construction of a multi-storey office complex

CMG6304 Occupational Safety and Health Assignment 3 2026 | INTI University

FACULTY OF ENGINEERING AND QUANTITY SURVEYING

Master of Science Construction Management (Building Information Modelling) / Master of Science Construction Management (Facility Management)

Name

 

 

Unit  Code &

Title

CMG6304 –

OCCUPATIONAL SAFETY

AND HEALTH

 

Assignment Ref. No / Title

CMG6304-MAY26A3

 

Assignment type

Group

% of module mark

40%

 

Date hand out 

13th July 2026

Due date

2nd August 2026

 

Time taken (weeks)  :-

3 weeks (Week 9 – 11)

Lecturer

Ms. Sangeetha Arjinan

Assignment No. / Title:-

HIRARC

Penalties: 

Marks will be reduced by 10% of the original mark for every week late. No work will be accepted that is more than one week late. If you are unable to submit coursework on time due to extenuating circumstances, you may be eligible for an extension. 

 

Learning Outcome:

At the end of the course, the students must be able to: -

1. Formulate HIRARC for a proposed construction project. (C6,PLO1)

 

Assessment Marks and General Comments:

Learning Outcome

Task No

Mark Allocation (%)

Total (%)

Assessment Type

Submission Deadlines

Remark

PLO1

 

 

 

 

 

3

1

100

 

100

Report

Week 11

 

Report Structure

Headings

Style

Grammar

Format

Attach

Citation

Reference

Plagiarism

 

 

 

 

 

 

 

 

TOTAL

 

Student’s Feedback and Acknowledgement: 

 

 

 

Signature:                                                                                                                                                Date: 

HIRARC Preparation for Construction Site 

Answer the following questions in report format and combine the report content into single PDF document for submission. 
 
Scenario: 
 
You have been appointed as the Site Safety and Health Officer (SHO) for a commercial building development project currently in the pre-construction stage. The project involves the construction of a multi-storey office complex incorporating underground works, reinforced concrete structures, and steel framework installations.  
 
Before site activities commence, the project director has instructed you to establish a comprehensive HIRARC to identify potential safety and health risks associated with the construction phase. This document will function as a primary safety planning tool and will be referenced throughout the project duration.  
 
The HIRARC must be prepared in accordance with the Department of Occupational Safety and Health (DOSH) Malaysia – Guidelines for Hazard Identification, Risk Assessment and Risk Control, or other recognized international safety standards.  
 
Task Requirements:  
 
1`. Project Overview:  
 
Provide a concise overview of the proposed construction project, including:  
•    Type and purpose of the building  
•    General location and surrounding environment  
•    Overall project complexity and safety challenges  
 
2`. Hazard Identification:  
 
Identify three (3) major construction activities expected during the construction phase. For each activity, identify three (3) potential hazards  
 
Hazards may fall under, but are not limited to:  
•    Physical hazards (e.g. machinery, falls, moving vehicles)  
•    Chemical hazards (e.g. dust, fumes, cement exposure)  
•    Ergonomic hazards (e.g. manual handling, awkward posture)  
•    Psychosocial hazards (e.g. fatigue, work pressure, stress)  
 
List each hazard clearly under the relevant work activity.  
 
3. Risk Assessment:  
 
For each identified hazard, assess the level of risk. Use a risk matrix to categorize the severity and likelihood of each hazard. The typical scale for risk assessment is:  
•    Likelihood  
•    Consequence  
•    Risk Rating: A combination of likelihood and consequence  
 
The risk assessment shall reflect realistic site conditions and typical construction practices. 

3. Risk Control Measures:  
 
Propose appropriate control measures for each hazard by applying the Hierarchy of Controls, in the following order:  
1.    Elimination  
2.    Substitution  
3.    Engineering controls  
4.    Administrative controls  
5.    Personal Protective Equipment (PPE)  
 
Each control measure must be practical, relevant to construction work, and aligned with legal safety requirements.  
 
Submission Requirements:  
 
1. Detailed Report Format 
 
•    Provide an introduction to the project and the importance of HIRARC for safety.  
•    For each activity, clearly explain each hazard identified, the reason behind the risk rating, and the rationale for selected control measures. 
•    Conclude with a summary of the overall risk level for each activity after control measures are applied and any further recommendations. 
•    Research and Reference: Support your analysis with relevant standards and guidelines, such as OSHA (Occupational Safety and Health Administration), local safety regulations, or construction safety best practices. 
 
Report Format  
 
The criteria of report submission should fulfil the followings: -  • Using font Arial, size 11, spacing 1.5 and Justified paragraph.  
•    Citation must be provided in text. (if any)  
•    References and Bibliography list following Harvard Referencing System. (if any)  
 
The structure of the report should include but not limited to the following sections:  
1.    Table of Contents  
2.    Introduction &  
3.    Project Overview  
4.    Hazard Identification  
5.    Risk Assessment  
6.    Risk Control Measures  
7.    Conclusion  
8.    References  
9.    Appendix: HIRARC Table (Compulsory